Due to the sudden arrival of warm weather here, I have been spending much of my time getting lawns done and flowerbeds ready for planting. It's hard to believe that two weeks ago, we had some major snow and now today it is 25C, flowers and trees are blooming! Both of my neighbors are already running their air conditioning units. I've enjoyed sitting outside in the evening this week working on my applique for my Joseph's Coat.
My projects to finish for the PhD Challenge are falling behind. In order to meet the number I committed to, I will need to do at least 2 this month and 2 in June. I'm not sure if that is possible but will hopefully I can find a bit more time now to work on those.
My Pink Lemonade quilt is still hanging on the design wall. How long does it take for a project to switch from being a WIP (Work In Progress) to a PhD (Project half Done) to a UFO (Un-Finished Object)?? Is there a guideline somewhere? I've also fallen behind by two whole blocks on the Hazels Diary Quilt-along. I guess I'd better get off of here and go work on something!
WEEK 20 Stash Report
Used this week: 0 M
Used Year to Date: 17.55 M
Added this week: 0 M
Added Year to Date: 12.07 M
Net used for 2010: 5.48 M
Check out how everyone else is doing with their stash busting efforts on Judy's blog.


