Showing posts with label Hazel's Diary. Show all posts
Showing posts with label Hazel's Diary. Show all posts

Sunday, July 18, 2010

Sunday.... Again!















Do weeks pass more quickly in summer? I've managed to catch up a little with Hazel's Diary Quilt-along finishing block 6 and 7 plus the last 6 alternate blocks. I'm not sure I like my fabric choices for Block 7 (on the right). I may end up re-making that one at the end when I see what fabric I have left over.




Then,  Block 1 has been bugging me since I made it so, I decided to try fixing it. I took it apart and re-oriented the yellow and teal. Now I like it more!! See original here.



STASH REPORT for Week #29
Used this week: 1.2 M
Used Year to Date: 19.86M
Added this week: 0 M
Added Year to Date: 17.07M
Net used for 2010: 2.79M

Read everyones reports on Judy's blog.

Sunday, July 4, 2010

Even Small Steps Forward Is Progress!

A little bit of sewing has been happening here and I do mean a little! I needed a clothespin bag and, instead of being patient and waiting to find the one I really wanted to do (see my previous post), I just went ahead and created a utility version. This is my new clothespin bag! Nothing too fancy, just used a fat quarter and some bias tape I'd had sitting around for a long time.
Two more blocks for Joseph's Coat were appliquéd this week bringing my total to 19 now. My hopes of doing 3 or 4 blocks a week have not materialized. Since I had to use 2 different background fabrics, I need to figure out what backgrounds I still need to cut and out of which fabric before I start assembling my first two rows. The last thing I want is to have to take them apart again...
Block 5 for the Hazels Diary was completed. Now I am only 3 behind...

My oldest grandson (13) is staying with me for a few weeks and I'm doing my best to try to keep him busy. That means doing things like cleaning out the garage and doing some repair work around the house instead of sewing. He's already washed both the car and truck twice by hand just for something to do!  Wonder if he'd like to learn to quilt??

STASH REPORT for Week #27

Used this week: .36 M
Used Year to Date: 18.66M
Added this week: 0 M
Added Year to Date: 17.07M
Net used for 2010: 1.59M

Sunday, May 16, 2010

Stash Report for this week

All of my quilting time this week has been spent on finishing more blocks for my Joseph's Coat quilt. All of the fabric I used has already been reported. The picture above is a few of my finished blocks laid out to show how they will (eventually) look when they're all joined together.

Due to the sudden arrival of warm weather here, I have been spending much of my time getting lawns done and flowerbeds ready for planting. It's hard to believe that two weeks ago, we had some major snow and now today it is 25C, flowers and trees are blooming! Both of my neighbors are already running their air conditioning units. I've enjoyed sitting outside in the evening this week working on my applique for my Joseph's Coat.

My projects to finish for the PhD Challenge are falling behind. In order to meet the number I committed to, I will need to do at least 2 this month and 2 in June. I'm not sure if that is possible but will hopefully I can find a bit more time now to work on those.

My Pink Lemonade quilt is still hanging on the design wall. How long does it take for a project to switch from being a WIP (Work In Progress) to a PhD (Project half Done) to a UFO (Un-Finished Object)?? Is there a guideline somewhere? I've also fallen behind by two whole blocks on the Hazels Diary Quilt-along. I guess I'd better get off of here and go work on something!


WEEK 20 Stash Report
Used this week: 0 M
Used Year to Date: 17.55 M
Added this week: 0 M
Added Year to Date: 12.07 M
Net used for 2010: 5.48 M

Check out how everyone else is doing with their stash busting efforts on Judy's blog.

Sunday, March 28, 2010

Sunday Stash Report

I did a fair bit of catching up this week. Just this morning I finished Block 4 of the Hazel's Diary Quiltalong mystery. I had more trouble with this block than the first 3. The center part just seemed too small so the block doesn't look as square as it should. But, I really like how its turning out overall with the bright colors against the black background I'm using. I think I might be the only one working with a black background. Check out the Hazel's Diary Flickr Group for more photos from others doing this project.

Here are my first 4 blocks.

To see what else I did this week, check my previous post.

WEEK 13 STASH REPORT

All fabric used this week went into the melons (petals) for my Joseph's Coat quilt.

Used this week:               .50 M
Used Year to Date:      16.75 M
Added this week:               0 M
Added Year to Date:     7.90 M
Net used for 2010:        8.85 M

Be sure to check out how everyone else has done this week with their stash use on Judy's blog.

Saturday, March 27, 2010

Catching Up

I've been working on a few things all week in an effort to catch up with some of the projects I am doing.

1. Joseph's Coat - worked every evening for 6 days to get ALL the rest of the melon shapes prepared. I'm done that part of it!! YAY!! Now I can work on the applique...

2. Caught up on "Hazel's Diary Quiltalong". I have finished Block 2 and 3 plus caught up-to-date with Block 4!! These are 6 inch finished blocks so the pieces are rather tiny and can be a bit hard to get the points all lined up and meeting. But, as my Dad used to say... "They'll never see it from the highway!"

3. Finished assembling the feathered star block that was a tutorial on Erin's blog One Piece At a Time. I had a bit of trouble with this as it seemed like some parts were either too large or too small to fit together correctly. My block will probably never lay flat...


I've played a bit with the pink & yellow quilt blocks on the wall. I'm still moving them around a little but I hope that I will soon be happy enough with the arrangement to go ahead and sew it all together.

Tuesday, February 9, 2010

Catching up with Hazel

Yesterday seemed like as good a day as any to catch up with the steps for Hazel's Diary Quiltalong. I am now right up to Feb 8th! Considering that I had not even started cutting until yesterday and I also had to spend time ironing all my fabrics, it didn't take long to get up to speed. Here's my first block and setting block.
 
I am working on the smaller option and some of these pieces are a bit tiny so you need to be careful with seam allowances. If you haven't joined in yet, there is still time to grab some fabric and start. It should only take you about 3 hours to get caught up.